Skip to content
ImoleMovement

Delivering for Osun

Projects across Osun

Projects of the Adeleke administration, by LGA. Each entry links to its public source.

projects documented
13projects documented
Completed
6Completed
Ongoing
7Ongoing
LGAs
12LGAs

13 shown

✓ CommissionedOsogbo

Roads & bridges

Oke-Fia Flyover, Osogbo

A 10-span flyover, about ₦10.7bn, declared open in August 2026.

7 Aug 2026Source ↗
● OngoingStatewide

Health

Primary health centre renovations

A statewide plan to renovate primary health centres; phase 2 covers 124 centres (₦2.76bn).

1 Aug 2026Source ↗
✓ CommissionedEde North, Ede South

Roads & bridges

Ede dual carriageway: Akoda – Baptist High School – Oke Gada

About 9 km of dualised road in Ede, commissioned on 28 July 2026.

28 Jul 2026Source ↗
✓ CommissionedIla

Roads & bridges

Ila-Orangun township road dualisation, phase 1

Phase 1 (3.5 km of a planned 10 km) commissioned on 24 July 2026; the rest is ongoing.

24 Jul 2026Source ↗
✓ CommissionedIlesa East, Ilesa West

Education

University of Ilesa projects

Six projects commissioned in July 2026, including a law annex, public health building, internal roads, hostels and a basic clinical sciences faculty.

14 Jul 2026Source ↗
✓ CommissionedOsogbo

Roads & bridges

Lameco Flyover, Osogbo

A 672-metre flyover, about ₦8.52bn, under the state's infrastructure plan. Commissioned on 1 July 2026; a section developed faults in late July and the Governor ordered repairs.

1 Jul 2026Source ↗
● OngoingOsogbo, Olorunda, Ifelodun, Odo Otin

Roads & bridges

Osogbo – Ikirun – Ila Odo road dualisation

A 39 km dualisation, second phase flagged off in July 2025, passing through Ikirun and Okuku.

15 Jan 2026Source ↗
✓ CommissionedOsogbo

Health

Modupe and Folorunso Alakija Medical Research and Training Hospital, UNIOSUN

A philanthropist-funded teaching hospital at Osun State University, inaugurated in December 2025 on land donated by the Ataoja of Osogbo.

17 Dec 2025Source ↗
● OngoingIfe Central

Roads & bridges

Ile-Ife (Lagere Junction) Flyover

A ₦14.94bn flyover flagged off in May 2024 and inspected by the Governor in October 2025.

29 Oct 2025Source ↗
● OngoingStatewide

Education

Classrooms and model schools

Classroom renovation across the state and new model schools in Osogbo.

1 Sept 2025Source ↗
● OngoingIlesa East, Ilesa West

Roads & bridges

Ilesa Brewery – Palace road dualisation

A 6.2 km dualisation launched around May 2024; reported 78% complete in July 2025.

1 Jul 2025Source ↗
● OngoingStatewide

Workers & welfare

Pension and salary arrears

A ₦4.27bn bond approved in May 2025 to clear contributory pension arrears, alongside payment of inherited salary and pension arrears.

1 May 2025Source ↗
● OngoingEde North, Osogbo, Iwo

Water

Waterworks rehabilitation

Rehabilitation of water schemes began in April 2023, with pipeline upgrades at Ede and Osogbo and filter repairs at Iwo.

17 Apr 2023Source ↗

Federal projects in Osun

● OngoingOsogbo, Iwo, Ola Oluwa

Roads & bridges

Osogbo – Iwo – Ibadan road (Federal Government)

An 82 km federal road project (₦114.85bn, 24 months) flagged off on 6 August 2026.

6 Aug 2026Source ↗
● OngoingOsogbo, Olorunda, Aiyedaade

Roads & bridges

Osogbo – Gbongan road dualisation (Federal Government)

A 44 km federal dualisation (₦101.81bn, 24 months) flagged off on 6 August 2026. The Governor publicly thanked the President and the Works Minister for the approvals.

6 Aug 2026Source ↗
Join the movementSign in